Gas Tax Projects

Background

A Stable and Predictable Federal Gas Tax Fund

Canada’s Gas Tax Fund transfers $746 million to Ontario municipalities each year for environmentally sustainable infrastructure.  Since the launch of the fund in 2005, Ontario municipalities have invested more than $2.1 billion of funding into more than 3,800 infrastructure projects worth over $6.7 billion.

Originally launched as a five-year program, Canada’s Gas Tax Fund has now been made permanent through federal legislation. Municipalities in Ontario can rely on the Government of Canada as an essential long-term partner in the building of our communities.

2014

Recycle and Pave Perth Road 151

Location: 
Road runs from Perth Line 8 to County of Middlesex Boundary (Whalen Line).

Description:
Road runs from Perth Line 8 to County of Middlesex Boundary (Whalen Line), the road is in poor condition and should be recycled in order to re-new ride quality.  Project will be done in partnership with Middlesex County and extended into Middlesex to include paving on Road 59 into Granton.

Total Estimated Cost of the Project: $1,333,000

Estimated Gas Tax Funding: $1,088,000

2013

Bridge Rehabilitation & Culvert Replacements

Location:
4 Bridge structures and 2 culverts along Perth Line 72 and Perth Road 131.

Description:
The benefits of this project will be improve the safety of these sections of roadway and bridge structures with new guard rails, and to sustain the proper drainage and stream flow relates to the culverts.  Bridge structures and culverts located on Perth Road 131 and Perth Line 72.

Total Estimated Cost of the Project: $1,870,000

Estimated Gas Tax Funding: $1,319,500 

2012

Replacement of culvert #107101, located on Perth Road 107

Location:
Bridge #107101 located on Perth Road 107, Perth County.

Description:
The beneficiaries of this project are the motoring public using this road and the rate payers of Perth County. The benefits of this project will be to reduce the identified capital needs of the County, to improve the safety of this section of roadway, and to sustain the proper drainage and stream flow as it relates to this culvert.

Total Estimated Cost of the Project: $600,000

 Estimated Gas Tax Funding: $600,000

Rehabilitation of concrete structures #024107, #107053, #107146, #163058, and #024023

Location:
#024023 and #024107 located on Perth Line 24
#107053 and #107146 located on Perth Road 107
#163058 located on Perth Road 163

Description:
The beneficiaries of this project are the motoring public using these roads and the rate payers of Perth County. The benefits of this project will be to reduce the identified capital needs of the County, to improve the safety of these sections of roadway, and to sustain the proper drainage and stream flow as it relates to these structures.

Total Estimated Cost of the Project: $642,000

Estimated Gas Tax Funding: $642,000

2011

PERTH Road 119 RECYCLING AND RESURFACING INCLUDING MINOR IMPROVEMENTS OF CURBS AND DRAINAGE

Location:
Perth Road 119 from Stratford to Milverton Total Length: 23.7 KM

Description:
Cold in Place recycled and overlaid with hot mix that includes RAP which will reduce the identified capital needs of the County and improve the quality of the road leading to improved safety and reduction of greenhouse gases. The asset lifespan of this road section will be extended to 15-20 years.

Total Cost of the Project: $4,047,644

Gas Tax Funding: $1,210,322

Installation Solar Panel at Mitchell work yards

Location:
52 Frank Street, Mitchell, ON.

Description:
Perth County installed solar arrays of 10 kW, which feed the energy produced into the hydro grid under the current Provincial feed in tariff (FIT) program.  This array will produce 15,655 kWh per year, reducing the County’s GHG emissions by 10.6 tons of CO2. This will resulted in less operating cost and CO2 reduction.

Total Cost of the Project: $103,223

Gas Tax Funding: $103,223

2010

Replacement of Culvert

Location:
Perth Road 147, Lot 31 -32, Conc 7, Elma TWP.

Description:
Replacement of the culvert will renew this particular capital asset, with a predicted lifespan of 80 years. The project will use pre-cast concrete sections, significantly shortening the construction period, allowing traffic to travel unimpeded for longer than would otherwise be expected with this type of project.

Total Cost of the Project: $ 424,011.27

Gas Tax Funding: $ 424,011.27

Reconstruction of Perth Road 180 and Structure # 180145

Location:
Perth Road 180 and Structure #180145 in Dublin Ontario.

Description:
Extends the asset lifespan of this road section for 15-20 years, will incorporate significant quantities of recycled and reclaimed material, and will alleviate existing issues with drainage and flooding.

Rehabilitation of County Bridge #180145, greatly increasing the remaining life expectancy of this asset by 40-50 years, which decreases the County's long-term capital needs.

Total Cost of the Project: $ 698,923.53

Gas Tax Funding: $ 698,918.56

2009

Perth Line 32 Resurfacing

Location:
Perth Line 32, from Perth Road 130 to Perth Road 122

Total Length: 4.1 KM

Description:
Cold in Place recycled and overlaid with hot mix that includes RAP which will reduce the identified capital needs of the County and improve the quality of the road leading to improved safety and reduction of greenhouse gases. The asset lifespan of this road section will be extended to 15-20 years.

Total Cost of the Project: $521,365.54

Gas Tax Funding: $473,365.54

Perth Road 139 Resurfacing

Location:
Perth Road 139, from Perth Road 180 to Town of St. Mary's limit.

Total Length: 9.0 KM

Description:
Cold in Place recycled and overlaid with hot mix that includes RAP which will reduce the identified capital needs of the County and improve the quality of the road leading to improved safety and reduction of greenhouse gases. The asset lifespan of this road section will be extended to 15-20 years.

Total Cost of the Project: $1,300,245.09

Gas Tax Funding: $1,127,608.43

 

2007

Perth Road 163 Resurfacing

Location:
Commencing at Rannoch and extending north for 7.9 kilometres.

Description:
Cold in Place recycled and overlaid with hotmix that includes RAP which will reduce the identified capital needs of the County and improve the quality of the road leading to improved safety and reduction of green house gases.  The asset lifespan of this road section will be extended to 15-20 years.
 
Total Job Cost: $992,000.00
 
Gas Tax Funding: $593,493.67

 

2006

Perth Road 135 Resurfacing

Location:
Commencing at the north limit of Rostock, north to Perth Line 55. Distance of 6.1 kilometres.

Description:
Cold in Place recycled and overlaid with hotmix that includes RAP which will reduce the identified capital needs of the County and improve the quality of road leading to improved safety and reduction of green house gases. The asset lifespan of this road section will be extended to 15-20 years.
 
Total Job Cost: $615,141.38
 
Gas Tax Funding: $579,790.70

Culvert Replacement 044-013

Location:
Concession 8, Lot 3 Township of Perth East, Ellice Ward 

Description:
The culvert at this location was replaced resulting in a reduction of the identified capital costs needs of the County, safety improvements and elimination of the need for load limit restrictions.
 
Total Job Cost: $214,301.01
 
Gas Tax Funding: $ 33,733.00

Culvert Replacement 086-103

Location:
Concession 1, Part Lot 1 Township of Perth East, Mornington

Description:
The culvert at this location was replaced resulting in a reduction of the identified capital costs needs of the County, safety improvements and elimination of the need for load limit restrictions. 
 
Total Job Cost: $129,429.99
 
Gas Tax Funding: $18,333.00

2012

Replacement of culvert #107101, located on Perth Road 107

 Location: 

Bridge #107101 located on Perth Road 107, Perth County.

Description:

The beneficiaries of this project are the motoring public using this road and the rate payers of Perth County. The benefits of this project will be to reduce the identified capital needs of the County, to improve the safety of this section of roadway, and to sustain the proper drainage and stream flow as it relates to this culvert.

Total Estimated Cost of the Project: $600,000

 Estimated Gas Tax Funding: $600,000

Rehabilitation of concrete structures #024107, #107053, #107146, #163058, and #024023

Location:

#024023 and #024107 located on Perth Line 24

#107053 and #107146 located on Perth Road 107

#163058 located on Perth Road 163

Description:

The beneficiaries of this project are the motoring public using these roads and the rate payers of Perth County. The benefits of this project will be to reduce the identified capital needs of the County, to improve the safety of these sections of roadway, and to sustain the proper drainage and stream flow as it relates to these structures. 

Total Estimated Cost of the Project: $642,000

 Estimated Gas Tax Funding: $642,000